DELTA®-MS 20 - Tunnel Bottom Application
Its high drainage capacity enables DELTA®-MS 20 to meet all requirements for occurring water problems on tunnel construction projects.
With its 20 mm studs and very high drainage capacity, DELTA®-MS 20 is suited for use as a high performance seepage and drainage layer in tunneling and other double-shell horizontal or vertical constructions.
Studded membrane made of special, high-density polyethylene.
When laid horizontally on the bottom: Laid between the base slab and carriageway surface, DELTA®-MS 20 effectively drains away any water and channels it to the drainage pipe.
| Stud height | approx. 20mm |
|---|---|
| Roll sizes | 2.0 x 20m (if required for specific buildings can also be supplied as panels) |
| Pressure resistance | approx. 150kN/m² |
| Volume of air between the studs |
approx. 14 l/m² |
| Temperature resistance | -30°C to +80°C |
| Chemical properties | Resistant to chemicals Root-proof Rot-proof Harmless to drinking water |
| Drain capacity | approx. 10 l/s x m or approx. 600 l/min x m or approx. 36000 l/h x m |